Albin Vega To-Do List

To-Do List, Completed prior to sale

  • Rigging
    • Drop Mast (1/8/2017)
      • Check rigging condition
      • Remove cutter rigging
      • Install anchor light
      • Install masthead VHF antenna
      • Repair mast base (shorten)
      • Install masthead wind indicator
    • Rebuild Harken winches (2/13/2016)
    • Install backstay vang
  • Power
    • Install Tohatsu Outboard (August 2016)
      • Outboard bracket
      • Outboard Engine
        • Wire stator
        • Wire electric starter
      • Remote throttle control
      • Remote steer control
    • Sails
      • Replace broken mainsail slider
      • Replace hanks on new jib
  • Navigation
    • Rebuild Fleming Wind Vane (2/5/2016)
    • GPS
      • Configure Macbook GPS/OpenCPN (June 2016)
      • Reinstall Garmin GPS128 (Removed from plans)
  • Deck
    • Sand
    • Fill old holes
    • Install new dodger grab handles
    • Reconfigure radar tower brace for mobility (December 2015)
    • Paint
    • Re-seal bridgedeck
  • Cabin
    • Carpentry
      • Fabricate seat back cabinet sliders (Removed from plans)
      • Redo galley cabinet sliders (1/18/2017)
      • Over-head door moulding (Removed from plans – head clearance)
      • Forward mast step arch moulding (Removed from plans)
      • New cover for under-companionway (2/27/2016)
      • Anchor locker cover (July 2016)
      • Companionway step hinge (2/13/2016)
      • Cut companionway slider into hinged slats (June 2016)
    • Windows
      • Install new Lewmar portlights (1/17/2017)
    • Install Lagun Table Mount
      • Cabin (1/2016)
      • Cockpit (June 2016)
      • Fill old holes
    • Install extra galley table (January 13, 2017)
    • Retrofit LEDs into existing incandescent fixtures
    • Stove
      • Install new electric/retro’d propane Kenyon (July 2016)
    • Install boarding ladder
    • Install MOB throw
    • Install MAGMA grill
  • Electrical System
    • Reconfigure Electrical System (12/2015)
      • BusBar
      • Battery switch
      • Bilge pump switch
      • Install new monitor
      • Relocate batteries
      • Install charger
    • Power Generation (3/6/16)
      • Solar (3/6/16)
        • Install new solar panels (2 x Renogy 50 watt) (3/6/16)
        • Install new solar controller (2/29/2016)
          • Tracer 2215BN (2/29/2016)
          • MT50 (2/4/16)
      • Wind (2/29/2016) (12/7/16)
        • Install Wind Generator (Rutland 503) (2/29/16)
        • Install Wind Charge Controller (SR60) (2/29/16)
        • Replace w/ Rutland 913 Wind Generator (12/7/16)
        • Replace w/ Rutland HRS913 (12/7/16)
    • Communication/Emergency
      • Install Standard Horizon GX2200 VHF/AIS (July 2016)
  • Ground Tackle
    • Anchor
      • Purchase Mantus
    • Bow Roller
      • Install new roller
  • Comfort/Tankage/Provisions
    • Install Engel Fridge/Freezer (2/22/2016)
    • Water Tankage
      • Clean water tanks
      • Change filters
      • Add aux tank or cans (Removed from plans)
    • Fuel Tankage
      • Install new tank
    • Stereo System
      • Install Kenwood Stereo (2/3/16)
      • Install Alpine Cabin Speakers (2/3/16)
      • Install Cockpit Speakers (June 2016)
  • Misc
    • Head
      • Install Nature’s Head toilet
    • Bilge
      • Replace electric bilge pump (12/2015)
        • Install Ultra pump switch
        • Install Rule switch
        • Replace Rule pump
      • Manual pumps
        • Rebuild, replace or remove in-bilge manual pump (Removed January 2016)
        • Replace deck lid for cockpit-mounted manual pump
    • Lower stanchions back to stock height (10/8/2016)
      • Finish installing stanchions (drill holes)